Where does BNSF operate PTC?
Currently, BNSF is the only Class I freight railroad to have completed the installation of PTC on all of our mandated subdivisions. Within our mandated subdivisions, including in Washington state, 90 percent of BNSF’s trains are now running on PTC. We continue to test the system in advance of the Dec. 31, 2018 deadline. Testing is a critical part of the PTC implementation once the technology has been installed on our tracks and locomotives. We have also run more than 800,000 successful PTC trips.
In Washington, BNSF is installing PTC on more than 970 miles of track, which includes our Spokane, Bellingham, Columbia River, Fallbridge, Lakeside, Scenic and Seattle subdivisions. Overall, the scope of BNSF’s PTC installation includes installing PTC technology on 5,000 locomotives and 11,300 miles of track.
How does passenger rail fit in?
As part of our process, BNSF must address not only the issues of implementing PTC for freight service, but also the unique equipment, software and integration involved with passenger railroads and non-BNSF locomotives that operate on our tracks. Implementation cannot be complete until interoperability with the other railways is complete. We are unable to test interoperability on a wide scale until other railroads have also completed their infrastructure installation.
While each railroad, be it passenger or freight, maintains its own system, the industry has committed to using similar technology standards. Coordination is key and in Washington, BNSF has a strong collaborative effort among its partnering agencies involved in the implementation of PTC. Every railroad is required to have their own PTC system that is interoperable with other railroads’ PTC systems. In Washington, for passenger trains that run on BNSF tracks, they will not be operating with PTC until the appropriate agencies have completed their own PTC installation.
We look forward to working with other railways and partners, including those in Washington state, to expand interoperability. BNSF is on track to meet the Dec. 31, 2018 deadline for PTC implementation and we continue to work closely with the FRA, and other railroads to ensure PTC enhances rail safety wherever it operates.